In the first phase of the project, Hidden Lake Dam was removed (before photo on left before the dam and lake were removed) and Boeing Creek was restored through the former lakebed (after photo on right showing restored stream channel). The City is now constructing the Hidden Lake Dam Removal (Phase 1) Project and is in the final design for the NW Innis Arden Way Culvert Replacement (Phase 2) Project. Phase: Construction (Phase 1 - Dam Removal) Final Design (Phase 2 - Culvert Replacement) Project Overview Stormwater Pipe Repair and Replacement Program.Sidewalk Rehabilitation Project: 5th Avenue NE (NE 165th Street to NE 175th Street).Sidewalk Rehabilitation Project: 15th Avenue NE (NE 155th Street to NE 175th Street).1st Avenue NE (N 145th Street to N 155th Street) Sidewalks.New Sidewalks Project: 20th Avenue NW (NW 190th Street - NW 195th Street).New Sidewalks Project: 5th Avenue NE (NE 175th Street to NE 182nd Court).Ridgecrest 5 Sanitary Sewer Rehabilitation.Ridgecrest Safe Routes to School Project.Richmond Beach Road Midblock Crossing and Citywide Safety Project.Pump Station 26 & Citywide Stormwater Safety/SCADA Improvements +.Appeal to Growth Management Hearings Board.NE 148th Street Infiltration Facilities Project.N 175th Street Sanitary Sewer Replacement.N 155th Street Overlay and Pavement Preservation.Lower Storm Creek Erosion Management Project.Annual Road Surface Maintenance Program +.175th Street Corridor Improvements Project.160th and Greenwood / Innis Arden Intersection.145th Street and I-5 Interchange Project.145th Street Corridor Project (Linden Avenue to I-5).25th Avenue NE Ballinger Creek Habitat Restoration and Flood Reduction Project.10th Avenue NE Drainage Improvements Project.
0 Comments
Leave a Reply. |